What We Do

Services

Every service here gets built around how the structure holds up over time, not just how it looks on day one.

Home › Services

Everything we take on

Every job below is one we do ourselves across Peoria.

Deck Installation

We build new decks from the ground up, starting with footings set below the frost line and a ledger board bolted and flashed to the house correctly. Framing, decking material and railings all get sized to the load and the look you want.

Deck Repair

We fix sagging frames, soft or rotted boards, loose railings and stairs that have pulled away from the house. Most repairs come down to water getting somewhere it shouldn't, so we chase the leak before we replace anything.

Deck Staining & Sealing

Wood decking needs a fresh coat of sealer every two to three years or the sun and rain start breaking down the fibers. We pressure wash, let it dry fully, then stain so the color and protection actually hold.

Custom Deck Design

Multi-level decks, built-in seating, pergolas, whatever shape fits your lot and how you use the yard. We draw it out and price it before any lumber gets ordered.

Composite Deck Installation

Composite boards like Trex or TimberTech cost more upfront but skip the splintering, graying and annual staining that wood decking requires. We install with hidden fastener systems so you don't see a single screw head on the surface.

Deck Railing Repair & Installation

Loose balusters, wobbly posts and railings that don't meet the 36-inch code minimum all get addressed here. We rebuild railing sections to spec, not just tighten what's already failing.

Deck Replacement

When the frame underneath is too far gone to repair, we tear the whole deck out and start over rather than build new boards on top of a bad structure. You get a deck that's framed correctly the first time, not patched.

Deck Resurfacing & Board Replacement

If the frame is solid but the decking surface is cupped, splintered or gray, we strip it down and replace just the boards. Cheaper than a full rebuild when the bones underneath still check out.

Screened-In Deck Construction

We frame and screen in a deck or porch so you get the outdoor space without the mosquitoes, which matters in Illinois from about May through September. The framing has to carry the screen panels and a roof load, so it's built heavier than an open deck.

Deck Framing & Footing Repair

Heaving footings and rotted joists are usually the real reason a deck feels unsteady, not the surface boards. We dig out and reset footings below frost line and sister or replace joists that have gone soft.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Peoria, IL

Footings, framing and materials get adjusted for the towns and soil we're actually building in.

Peoria, IL
Bloomington, IL
Normal, IL
Pekin, IL
East Peoria, IL
Morton, IL
Washington, IL
Canton, IL
Chillicothe, IL
Eureka, IL
Metamora, IL
Dunlap, IL
Common Questions

Things worth asking

Questions that come up once a deck project actually gets underway.

Do I need a permit to build a deck in Peoria?
Most decks attached to a house and more than 30 inches off the ground require a building permit in Peoria and surrounding municipalities, including inspection of the footings before decking goes on. Permit requirements and fees vary by town, so this gets checked and handled as part of planning the project.
How long does it take to build a deck?
A standard single-level deck around 300 to 400 square feet usually takes 5 to 8 working days from footings to final board, weather permitting. Multi-level decks, screened-in porches, or jobs with a lot of custom railing take longer.
Can a deck be built to fit a specific budget?
Deck size, decking material and railing style all get adjusted to hit a target budget during the quoting stage. Pressure-treated lumber costs less upfront than composite decking, which is usually the first place to find savings.
Do you guarantee your deck work?
Workmanship on deck construction and repair is covered for a set period after completion, with the specifics put in writing on the estimate. Material warranties for composite decking brands like Trex or TimberTech are separate and come from the manufacturer.
Who will I be dealing with during the deck project?
One point of contact handles scheduling and questions from the first estimate through the final walkthrough, rather than switching between different office staff. The same crew that frames the deck is the one that finishes it.
What decking materials do you work with?
Pressure-treated pine, cedar, and composite brands such as Trex and TimberTech are all installed regularly, along with aluminum and cable railing systems for a different look than wood balusters. Each material comes with different maintenance requirements, which gets explained before a decision is made.
Do I need to be home or can I stay in the house during construction?
Homeowners can stay in the house throughout deck construction, since the work happens outside and doesn't require access to the interior except near the ledger board attachment point. Noise from saws and nail guns is normal during framing days.
Do I need to prepare the yard before deck construction starts?
Clearing furniture, grills, planters and anything stored under the current deck ahead of time speeds up the start of work. Sprinkler lines or buried cables near the footing locations should be marked or pointed out during the estimate.
What happens if you find rot or damage once the old deck is torn out?
Hidden rot in the rim joist or house framing behind an old deck's ledger board does turn up sometimes, and it gets flagged and priced as a change before any work continues on it. Nothing gets replaced or billed for without talking it through first.
How do I maintain a new deck after it's built?
Wood decking should be cleaned and resealed every two to three years to keep water from getting into the grain, while composite decking mainly needs periodic washing to keep mildew off the surface. Keeping leaves and debris out of the gaps between boards helps drainage and slows rot either way.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (309) 240-9370